• 256 393 240 788
  • info@sprinktechug.com
Facebook Twitter Youtube

  • Home
  • About Us
  • Services
  • Our Work
  • Blog
  • Our Shop
  • Products
    • All Products
    • Water Pumps
      • Surface Electric Pumps
      • Petrol Engine Water Pumps
      • Diesel Engine Water Pumps
      • Electric Submersible Pumps
    • Irrigation
      • Drip Irrigation
      • Sprinkler Irrigation
    • Solar
      • Solar Water Pumps
    • Generators
      • Petrol Generators
  • Contacts
  • Careers
Menu
  • Home
  • About Us
  • Services
  • Our Work
  • Blog
  • Our Shop
  • Products
    • All Products
    • Water Pumps
      • Surface Electric Pumps
      • Petrol Engine Water Pumps
      • Diesel Engine Water Pumps
      • Electric Submersible Pumps
    • Irrigation
      • Drip Irrigation
      • Sprinkler Irrigation
    • Solar
      • Solar Water Pumps
    • Generators
      • Petrol Generators
  • Contacts
  • Careers
  • at work
  • oil palm seeds
  • Sprinklers running
  • Pump testing
  • system handover

SUPPLY AND INSTALLATION OF A 2.8 ACRE SPRINKLER IRRIGATION SYSTEM

The purpose of the sprinkler irrigation system was to provide adequate water for a nursery bed with improved varieties of palm oil seedlings and complement other management options against the whitefly which is responsible for millions of losses to oil palm farmers. Sprinktech Limited implemented this project in partnership with NARO under the National Oil Palm Project.

Site conditions

Water source: Existing water pond

Size of the land: 2.8 acres

Maximum Head: 30 metres

Crop: Oil palm

Sprinkler Irrigation system scope

The scope of this sprinkler irrigation system included supply, delivery and installation of sub-main and main pipes (HDPE), diesel engine pump, riser pipes, fittings and sprinklers. The project also involved installing the irrigation system.
The following activities were done in the implementation stage;
• Trenching and backfilling for sub-main and mains from the water source
• Installation of the water distribution system. This included the laying of HDPE pipes 50mm for sub mains and 75mm for mains. It also included Connecting control valves on the main pipes and sub mains (8 in no.)
• Installation of the fixed sprinklers. This involved fixing saddle clamps 50mmx3/4’’and75mmx50mm, Connecting the riser pipes (66 in no.) and Fixing the sprinklers onto the riser pipes.
• Installation of the diesel engine pump.
• Testing, Calibration of the system and end-user training.
• System commissioning and handover.

Client:

NATIONAL AGRICULTURE RESEARCH ORGANISATION

Products Used
  • Diesel Engine Water Pumps - LDF 80C

« Motorisation of 5 boreholes in Nothern Uganda
Share
Previous Post

About us

Sprinktech Limited is the leading provider of water and energy solutions across agricultural, residential, and industrial sectors in Uganda With more than a decade of cumulative experience, we provide climate-smart and energy-efficient solutions for all your water and energy needs.

Quick links

  • About us
  • Projects
  • Gallery
  • Contact us

Facebook

Contact Us

  • Suite 10, Penn Station, Plot 6D. Seventh Street Kampala
  • +256 776018705
  • +256 393 240 788
  • info@sprinktechug.com

© Sprinktech Uganda 2020

WhatsApp us